The Downer Group would like acknowledge the excellent standard of work achieved by Blackley Construction during the installation of ultra-fast broadband (UFB) infrastructure to a residential Palmerston North property in April 2013. The job involved drilling from the property boundary to the dwelling – a distance of approximately 45m.
When I conducted the final quality assurance check at the property the owner repeatedly praised Blackley Construction and the quality of the job they performed; he said to me, “I can’t say enough about the Blackley guys, they were amazing.” He was particularly impressed with the drilling job performed by the Blackley crew as the drill had to be directed around a number of obstacles on his property, and he praised every aspect of their work and their professional conduct.
The property owner was also very impressed that the concrete reinstatement was completed on the same day, and the site was left in a better condition than before work began.
Congratulations to Blackley Construction and their drilling crew on a job well done.
Bruce Davies
Downer Group Ltd