Pahiatua Princess Street Sewer Replacement
Client: Tararua Alliance
Project Manager: Richard Apthorp
Job No: 9107
Site Supervisor: Anita Coffey
Key features of the work and/or statistics:
- Dig, lay and backfill 389 metres of sewer main.150mm PVC
- Remove 4 x existing manholes and install 4 x new manholes
- Dig, lay and backfill 16 lateral connections
Key equipment used:
- Hydrovac Truck
- Trucks – various
- 5T Excavator
Brief description of the work:
Blackleys Staff trenched 389 metres along Princess St at approx 1metre deep and removed the existing live sewer pipe and laid a new PVC pipe using a grade laser to ensure correct fall on the pipes. There were 4 manholes that also required replacement along this trenchline of varying sizes. The fall on this pipe was very slight and required close attention to ensure that the pipe line continued to flow.
Work was made more challenging due to the shallow wastewater pipe having other shallow services within close proximity and lateral connections that were encased in concrete.
As with all jobs involving hazardous and biological waste Blackley Enviromental and Health and Safety procedures were paramount for our staff while carrying out this work.