Farm Drainage – Masterton

Farm Drainage – Masterton Client: Peter McKenzie Project Manager: James Christensen Job No: 9906 Site Supervisor: Tika Rimal Key features of the work and/or statistics: Installation of 3,650m of Nexus Drainage Pipe Key equipment used: Interdrain 1515 Trencher – Fitted with GPS machine control Marooka with metal hopper and sled 7 t Excavator Topcon RTK GPS Brief…

Land Drainage – Mapuna Dairies

Land Drainage – Mapuna Dairies Client: Mapuna Dairies Project Manager: James Christensen Job No.: 7822 Site Supervisor: Jjames Christensen Key features of the work and/or statistics: Full RTK GPS contour surveying and then drainage design and build. Environmental compliance, co-operation with suppliers and other contractors. A feature was to design and build a large scale land drainage system to…

Cattle Underpass Plus Access Races

14m long Cattle Underpass Plus Access Races Client: Ross Burnett Project Manager: James Christensen Job No.: 6682 Site Supervisor: James Christensen Key features of the work and/or statistics: Final size was 3.5m x 2m x 14m This was a Design Build project which included liaison with Local Authorities, traffic management, underground services, road reinstatement, roadside drainage,…

Cow House – Massey University

Herd Home Cow House Project – Site Works Client: Massey University Project Manager: James Christensen Job No.: 7028 Site Supervisor: James Christensen Key features of the work and/or statistics: The project involved earthworks for the building platform and the outlet design and installation of building stormwater drainage. Key equipment used: Kobelco SK210 and SK 135 excavators Komatsu D53 Bulldozer…

Drainage – Ohakea Runway

Runway Drainage – Ohakea Client: Higgins Contractors Project Manager: James Christensen Job No: 6975 Site Supervisor: Jason Turner Key features of the work and/or statistics: The project involved the installation of 3300m of Megaflo 300 drainage medium complete with F2 filter material backfill The drainage was required to stop ground water seeping under the runway. Key equipment used: Marooka…

Irrigation System – Fonterra, Longburn

Extension to Factory Waste Irrigation System – Longburn Client: Fonterra Project Manager: James Christensen Job No.: 7556 Site Supervisor: Tony Brill Key features of the work and/or statistics: Location of existing services Staged installation to fit in with farm operations & new factory start-up deadline. Key equipment used: Ditchwitch 6510 Chain Trencher John Deer Tractor & Pipe Trailer Kobelco…

Irrigation – Te Hou

Te Hou Irrigation Client: Waterforce Contract Manager: James Christensen Job No: 7690 Site Supervisor: Tony Brill Key features of the work and/or Statistics Portions of the main line installation were trenched with the Mastenbroek trencher for faster installation. Excavators used on other portions. Key Equipment used: Mastenbroek 2015 Trencher Kobelco SK115 – 11 Tonne Excavator…