Farm Drainage – Masterton

Farm Drainage – Masterton Client: Peter McKenzie Project Manager: James Christensen Job No: 9906 Site Supervisor: Tika Rimal Key features of the work and/or statistics: Installation of 3,650m of Nexus Drainage Pipe Key equipment used: Interdrain 1515 Trencher – Fitted with GPS machine control Marooka with metal hopper and sled 7 t Excavator Topcon RTK GPS Brief…

Land Drainage – Mapuna Dairies

Land Drainage – Mapuna Dairies Client: Mapuna Dairies Project Manager: James Christensen Job No.: 7822 Site Supervisor: Jjames Christensen Key features of the work and/or statistics: Full RTK GPS contour surveying and then drainage design and build. Environmental compliance, co-operation with suppliers and other contractors. A feature was to design and build a large scale land drainage system to…

Drainage – Ohakea Runway

Runway Drainage – Ohakea Client: Higgins Contractors Project Manager: James Christensen Job No: 6975 Site Supervisor: Jason Turner Key features of the work and/or statistics: The project involved the installation of 3300m of Megaflo 300 drainage medium complete with F2 filter material backfill The drainage was required to stop ground water seeping under the runway. Key equipment used: Marooka…