Farm Drainage – Masterton

Farm Drainage – Masterton Client: Peter McKenzie Project Manager: James Christensen Job No: 9906 Site Supervisor: Tika Rimal Key features of the work and/or statistics: Installation of 3,650m of Nexus Drainage Pipe Key equipment used: Interdrain 1515 Trencher – Fitted with GPS machine control Marooka with metal hopper and sled 7 t Excavator Topcon RTK GPS Brief…

Cow House – Massey University

Herd Home Cow House Project – Site Works Client: Massey University Project Manager: James Christensen Job No.: 7028 Site Supervisor: James Christensen Key features of the work and/or statistics: The project involved earthworks for the building platform and the outlet design and installation of building stormwater drainage. Key equipment used: Kobelco SK210 and SK 135 excavators Komatsu D53 Bulldozer…