Farm Drainage – Masterton

Farm Drainage – Masterton Client: Peter McKenzie Project Manager: James Christensen Job No: 9906 Site Supervisor: Tika Rimal Key features of the work and/or statistics: Installation of 3,650m of Nexus Drainage Pipe Key equipment used: Interdrain 1515 Trencher – Fitted with GPS machine control Marooka with metal hopper and sled 7 t Excavator Topcon RTK GPS Brief…

Railway Road Stormwater

Railway Road Stormwater Client: Stringfellows Project Manager: Richard Apthorp Job No: 9203 Site Supervisor: Anita Coffey Key features of the work and/or statistics: Install 300mm diameter concrete stormwater pipe across Railway Road (approx 30m) Laid to specific grade to connect with future duct line and sump 100m into client property Trench 3.3m deep x 1.2m wide Key equipment…

Cable Laying- Te Uku Wind Farm

Te Uku Wind Farm- Cable Laying Client: Hick Bros Civil Construction Project Manager: Sean Faasen Job No.: 5338 Site Supervisor: Murray Blackley Key features of the work and/or statistics: The project required the installation of a total of 22,935m of trefoil cable. We used our “Direct Lay” process which see’s a single efficient production line with various…