Number of turbines Turbine capacity
26 2.3MW

 

The Mill Creek wind farm is located on the West Wind wind farm site. The wind farm was installed in 2014 and keeps the lights on for approximately 34,000 New Zealand homes annually. Boasting a 90% generation rate, the wind farm works hard for New Zealanders, and proves that the site provides a reliable renewable solution for New Zealanders.

19km of access tracks were developed within the site to ensure that the turbines and cabling could be developed, with approximately 800,000m3 of earthworks needing to be done.

View Other Projects
Client:
Meridian Energy
Date:
2014